الصفحة الرئيسية المملكة العربية السعودية Project Manager Cables
الصفحة الرئيسية المملكة العربية السعودية Project Manager Cables
Project Manager Cables
تفاصيل الوظيفة
Select how often (in days) to receive an alert:Designate to be responsible on site on behalf of consulting engineer as project manager and function as projects controlling activities in Qatar. Utilising expertise to watch and supervise cable projects activities and construction of works to ensure implementation, in conformity with the agreed contract specification. Designate competent engineers for the projects. Working closely with stakeholders (management, client engineers, project manager contractors and all engineers included in the projects…). Implement and respect strictly Tractebel's Ethics & Compliance policies/guidelines and cascade it within Qatar structure.Your Job Functions (DUTIES & Responsibilities):Responsible for following up the works done by the contractor, review the contractor's technical submittals, controlling the procedures of works to be complied with the tender specifications & general contract conditions. Reviewing the contractor Invoice.Ensuring that the Contract works will be strictly carried out as per the contract, instructions of the Client.Attending meetings with the client, contractors and subordinates.Administration of the client contract, strict implementation of safety procedures, rules & regulations, and minimum quality standards of the client and of other institutions as applicable.Co-ordinate and obtaining necessary approvals for safety documents and work permits for the works.Study record drawings, survey sheets and as built drawings of the client and of other authorities before commencing excavation.Prevention of damage to plant & equipment of the client and other utilities.Complying with the safety procedures and regulations of client Electricity Networks.Submitting Drawings incorporating the data collected from the site for approval of the client.Supervise for the completing all works within the agreed period of time.Responsible for the implementation of safety procedures/rules by the contractor/sub-contractors.Responsible for material approval. Verification and approval of materials as per contract specifications and as per the requirements.Establish and maintain records, which provide evidence that the works have been inspected and tested. These records should show clearly whether the product has passed or failed the inspections/tests according to defined acceptance criteria.Identify the inspection authority responsible for the release of the works.Establish and maintain documented procedures to control calibrate and maintain inspection, measuring and test equipment used by the contractor or supplier to demonstrate the conformance of the works to the specified requirements.Responsible for sub-contractor evaluation.Evaluate and select subcontractors on the basis of their ability to meet subcontract requirements including the quality systems.Will be responsible for audit by the client.Establish and maintain documented procedures for verification by the client that the quality activities and related results comply with planned arrangements and to determine the effectiveness of the quality system.Identify all inspection, procedures, measuring and test equipment that can affect the work quality and identify the valid relationships to international standards.Determine the measurements to be made and the accuracy required and select the appropriate inspection, measuring & test equipment that is capable of necessary accuracy and precision.Determine all non-conformities to be communicated with the client in detail.Determine all repair or reworks and record to denote the actual conditions. Suggest alternative solutions for the non-conformities. I.e. {a} Rework {b} accepted with or without repay by concession {c} regard for alternative applications {d} rejected or scrapped.Investigate the cause of non-conformities and records the results of investigation.Establish & maintain documented procedures for implementing corrective and preventive action.Periodical site visit in order to check the design implemented according to approved documentation.Our Capabilities (Degree, Experience, Other certificates if required, soft skills):Minimum Qualifications:Bachelor Degree in Electrical Engineering Discipline from reputable university.Should have worked for a minimum of 18 years in the capacity of EHV cable managerial and supervisory in the relevant field and should have handled major transmission projects (132kV/220/400 kV systems) involving supervision, inspection, erection and commissioning & testing of EHV cables & associated equipment and facilities etc.Should have experience in verification of selected material, route survey, inspection of existing underground cables, replacement of OHL and provision of underground HV cables, termination of cables.Must be fully conversant with all relevant international standards and should have working experience in ISO 9000 systems.Must have hands-on experience in supervision of cable jointing at least up to 380 kV.Conversant with all aspects of procedures, method statements, Safety Rules and procedures of cable laying and jointing of EHV cables up to and including 380 kV.Must have managerial and supervisory experience in KSA.Business Unit: GBU Energy SolutionsLegal Entity: Branch Office of TRACTEBEL ENGINEERINGContract Type: Fixed-TermJob Type: Full-TimeProfessional Experience: Senior (experience >15 years)
#J-18808-Ljbffr Project & Process Management
Apply safely
To stay safe in your job search, information on common scams and to get free expert advice, we recommend that you visit SAFERjobs, a non-profit, joint industry and law enforcement organization working to combat job scams.
الشركة المعلنة عن الوظيفة
Confidential
-
Scrum Master John Academy228 درهم
4,848 درهممدة الدورة التدريبية: Upto 6 Hours -
Microsoft Project Essentials 1TRAINING181 درهممدة الدورة التدريبية: Upto 10 Hours
Similiar Jobs that might interest you
Project Management Specialist
Baker Hughes... projects to our customers. Responsibilities: Ensures project ... of experience in Project Management). PMP Certified Strong ...
Saudi Arabia - Dammam 4 أيام مضت
Project Planner
Baker Hughes... projects to our customers. Responsibilities: Ensures project ... of experience in Project Management). PMP Certified Strong ...
Saudi Arabia - Dammam 4 أيام مضت
Project Mechanical Engineer
NES Fircroft... Saudi Arabia. Job Title: Project Mechanical Engineer Location: Saudi ... working as a Mechanical Project Engineer working in ...
المملكة العربية السعودية 4 أيام مضت
Managed Pressure Drilling
NES Fircroft... Oil and Gas Specifically into Managed Pressure Drilling. With over 90 ...
المملكة العربية السعودية 4 أيام مضت
PM315-ESG-Project Coordinator
Halliburton... project manager for all aspects of bigger, more complex fully integrated projects ... Halliburton Project Management Full ...
المملكة العربية السعودية 4 أيام مضت
Construction Project Engineer
Saudi Aramco (ASC)... are seeking a Project Engineer to join Unconventional Resources Project Management & Technical Services ...
المملكة العربية السعودية 4 أيام مضت
Construction Project Engineer
Saudi Aramco... are seeking a Project Engineer to join Unconventional Resources Project Management & Technical Services ...
المملكة العربية السعودية 4 أيام مضت
Sales Manager - KSA
Parker Wellbore... management support. Founded in 1934, Parker Wellbore helps customers manage ... of the project managers: sales strategy, ...
Saudi Arabia - Dammam 4 أيام مضت
Engineer - Project
NES Fircroft... Positions 10 Job Title Project Engineer Preferred Gender ... Selection criteria Strong project planning skills. Has ...
المملكة العربية السعودية 4 أيام مضت
ICT Project Specialist
NES Fircroft... . Role- ICT Project Specialist Job location- ... manage changes in project scope, schedule and costs. 7. Measure project ...
المملكة العربية السعودية 4 أيام مضت
Sr Counsel - Corporate & Project Finance
Saudi Aramco (ASC)... Corporate & Project Finance Legal Practice of the Project Development ... such transactions; Advise Management and internal ...
المملكة العربية السعودية 4 أيام مضت
Contracts Management Department Manager - Head office
Ably Resources Limited... contracts management including overall responsibility for contract management on large-scale projects. •Experience ...
المملكة العربية السعودية 4 أيام مضت
Organization & Management Consultant
Saudi Aramco (ASC)... , project day to day and deliverables management Mergers, acquisitions, and divestments requiring management ...
المملكة العربية السعودية 4 أيام مضت
Organization & Management Consultant
Saudi Aramco... , project day to day and deliverables management Mergers, acquisitions, and divestments requiring management ...
المملكة العربية السعودية 4 أيام مضت
HSE Manager
NES Fircroft... Gas co. Role- HSE Manager Location- SAUDI Job Description: ... of HSE experience of EPCI Project in oil & Gas industry. ...
المملكة العربية السعودية 4 أيام مضت
Offshore Installation Manager
NES Fircroft... co. Role- Offshore Installation Manager Location- SAUDI Job Description ... years' experience of EPCI Project in oil & Gas ...
المملكة العربية السعودية 4 أيام مضت
Reliability & Asset Management Engineer
Saudi Aramco (ASC)... ensure effective assets management through managing RTR reliability ... truly world-scale projects, supported by investment ...
المملكة العربية السعودية 4 أيام مضت
Reliability & Asset Management Engineer
Saudi Aramco... ensure effective assets management through managing RTR reliability ... truly world-scale projects, supported by investment ...
المملكة العربية السعودية 4 أيام مضت
Procurement Manager
NES Fircroft... are hiring for Role- Procurement Manager Location- Saudi Arabia With over ...
المملكة العربية السعودية 4 أيام مضت
لماذا تقوم بالإبلاغ عن هذه الوظيفة؟
Job has expired لا يمكن عرض هذه الصفحةبدلًا من ذلك، يمكنك النقر على الرابط أدناه أو نسخ/لصق الرابط في متصفح الإنترنت الخاص بك.
https://en-sa.whatjobs.com/coopob__cpl___2028_386087__2203?utm_source=2203&utm_medium=feed&keyword=Project-Manager-Cables&location=